ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

A picture drawn in perspective that employs a single point of vision is called Select one: A) one-point perspective. B) binocular vision. C) monocular vision. D
What statistical method summarizes large amounts of data
What should you do before suctioning a child who has an upper airway obstruction? A) determine if there is blood or debris in the airway B) give corticosteroids
What is the product of (4x + 2) and (3x - 1)?
How do you keep your pants up?
what is adam smith suggesting happens any time tradesmen meet together away from the general public?
Solve-0.4k-6=1.2 show your work
true or false. the scale tells us what some length on the scale drawing represents in actual length
Given `y=x^{2\ }\ -\ 6x\ -40\ ` 1. Get the factored form (x-r) (x-s)
What should you do before suctioning a child who has an upper airway obstruction? A) determine if there is blood or debris in the airway B) give corticosteroids