amberlemjudd amberlemjudd
  • 01-05-2020
  • Mathematics
contestada

it took 20 000 workers to build taj mahal in 20 years how long would it take to build if they had 8,000 workers

Respuesta :

coltongarretttanner coltongarretttanner
  • 01-05-2020

Answer:

50 years

Step-by-step explanation:

Answer Link
whyme533249
whyme533249 whyme533249
  • 01-05-2020

Answer:

160 years

Step-by-step explanation:

20/20000=0.001

0.001 x 8 x 20 = 160

Answer Link

Otras preguntas

the length L of a spring is given by L=(3/4)F + 5 where F is applied force. What force F will produce a length of 8?
Perimeter of a square with an area of 81cm2
What is a synonym for sensory language?A.simileB.fluencyC.metaphorD.imagery im thinkin D?
A movie starts at 7:00 pm and lasts 108 minutes. What time does the movie end?
Hassan's backyard swimming pool is 30 feet long, 20 feet wide, and 5 feet deep. There are 7.5 gallons of water in 1 cubic foot. How many gallons of water will t
find a common solution for each system of equations: y=3x+5 y=-5x-3
the length L of a spring is given by L=(3/4)F + 5 where F is applied force. What force F will produce a length of 8?
india takes the two hour train ride from minneapolis to chicago every dummer to visit her grandparents. The train traveled 44 7/16 (thats a mixed number) mile
in the xy-plane above, point c has coordinates (6,9). which of the follwoing is an equation of the line that contains points 0 and c?
Hello, I need help please for mission 3 thank you very much.