batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

Why was wilson not able to finish his speaking tour
p(x) x^3+x^2-x-1 Find all zeros of p (x)
I want to work with LDAP. what is LDAP?
On Being Brought from Africa to America by Phillis Wheatley 'Twas mercy brought me from my Pagan land, Taught my benighted soul to understand That there's a God
A tabletop in the shape of a trapezoid has an area of 6,550 square centimeters. Its longer base measures 115 centimeters and the shorter base is 85 centimeters.
the volume of a rectangle prism with square bases is 5880 cubic inches. it has a height of 30 inches. find the side length of the square base.
Compliant is to stubborn as excited is to
who was the founder of Pennsylvania?
where are the three parts of an atom located
Give a recursive algorithm for finding the sum of the first n odd positive integers.