batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

A Sum of $14 is made of 92 coins consisting of dimes and quarters. How Many are there of each kind of coin
Which monatomic ion has a charge of 1- and the condensed electron configuration [ne]3s23p6?
Another term used in place of the plot term denouement can be _______
The ______ theory of color vision holds that we perceive colors because of pairs of receptors that make antagonistic responses.
A cone with a mass of 6 g has a radius measuring 5 cm and a height of 2 cm. What is its density?
We made this casserole using what was already in ______ refrigerator. A our B ours C ourselves
Which phrase best defines a food web? A. the sum of all actual feeding relationships in an ecosystem B. a single pathway of feeding in an ecosystem C. the e
According to poushali ganguly in pros and cons of globalization, is globalization a new phenomenon?
To go bowling it costs $2 to rent shoes and then $3.25 for each game bowled. Which of the following functions gives the total cost to bow g games?
What is the smallest number greater than 100 that is : a)divisible by two ? b)divisible by ten? c)divisible by four ?